GET THE APP

Virtual preparation and commissioning of production systems inclu | 5140
Journal of Aeronautics & Aerospace Engineering

Journal of Aeronautics & Aerospace Engineering
Open Access

ISSN: 2168-9792

Virtual preparation and commissioning of production systems including PLC-logic


3rd International Conference and Exhibition on Mechanical & Aerospace Engineering

October 05-07, 2015 San Francisco, USA

Petter Falkman

Chalmers University of Technology, Sweden

Posters-Accepted Abstracts: J Aeronaut Aerospace Eng

Abstract :

Vehicle manufacturing companies are today forced to handle and respond to a rapidly growing variety of vehicles, due to the environmental restriction on energy consumption and CO2 emissions. An additional requirement is also that these new innovative and environmental friendly products are produced in already existing factories. A clear trend today is also that production volume has to be changed with short notice to meet market changes. Today��?s manufacturing systems, therefore, have to be both energy and time-efficient, safe, as well as flexible to manage this complexity. The challenge is to reduce the production preparation time by bringing together mechanical and electrical engineers into a common virtual environment achieving a more efficient cooperation, enabling automatic generation of verified control programs. Another challenge is reducing energy consumption by embedding detailed robot energy optimization into early scheduling. A third challenge is to increase production efficiency, increase human and machine safety and decrease the number of discarded parts by performing virtual commissioning of entire manufacturing stations, including complete robot programs, control logic and safety equipment like HMIs. A required step, in order to handle the above described problems is to extend early process design and mechanical simulation with control logics to ensure an intended behavior. It has been shown that possible savings could be achieved if PLC programming and optimization is included in earlier production preparation phases together with new functionality based on formal methods.

Biography :