Research article · 19 Apr 2025
Research articlePublished 2015
Flood Risk Reduction of Rupnarayana River, towards Disaster Managementand#8211;A Case Study at Bandar of Ghatal Block in Gangetic Delta
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
The paper discussed the present state of flood at a junction point between two rivers at Bandar of Ghatal block in Gangetic delta and proposed a technological solution to reduced vulnerability of flood. While annual floods have the potential to wreak havoc on unprepared communities, spoil crops and endanger food security, they also play a vital role in agriculture. Flood Management and Mitigation is designed to minimize negative flood-related impacts while preserving the benefits. Flood mitigation involves the managing and control of flood water movement, such as redirecting flood run-off through the use of floodwalls and flood gates, rather than trying to prevent floods altogether. It also involves the management of people, through measures such as evacuation and dry/wet proofing properties for example. The prevention and mitigation of flooding can be studied on a number of levels: individual properties, small communities and whole area or towns or cities. The costs of protection rise as more people and property are protected. The most effective way of reducing the risk to people and property is through the production of flood risk maps. Most countries in the developed world will have produced maps which show areas prone to flooding events of known return periods. By identified areas of known flood risk, the most sustainable way of reducing risk is to prevent further development in those known flood risk areas. It is important for at-risk communities to develop a comprehensive Floodplain Management plan. Those communities that participate in the National Flood Insurance Program must agree to regulate development in the most flood prone areas. Communities should assign a floodplain administrator to oversee the management of the floodplain development permit process. Reduction of erosion hazard we can use by MZWA (Mapping and zoning of watershed area), RZB (Restricted Zone of Build up), various soft engineering techniques and other necessary methods without any negative impacts of natural resources.
Subjects
Geology and Earth ScienceAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Longdom does not store it.
More from this journal
The newest in Journal of Geography & Natural Disasters.
Research article · 17 Apr 2025
Warning, Evacuation and Community Response Reduced Loss of Human Life Due to the Impact of Tropical Cyclone Yaas in Odisha
Commentary · 1 Apr 2025
Volcano Monitoring Networks: A Comparative Geographic Study of High-Risk Nations
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalJournal of Geography & Natural Disasters
- SubjectGeology and Earth Science
- BylineArticles whose byline prints “Biplab Das”
- BylineArticles whose byline prints “Aditya Bandyopadhyay”
